Palestra House – Secure Control Room kitchen refurbishment
Works consisted of the removal of an existing welfare facility, design and fabrication of a new stainless steel bespoke welfare facility, including decoration, new flooring and electrical installation.
Project Details
-
Client
Transport for London - LUCC -
Region
Central London -
Sector
Design-and-Build, Transport